From billet to finished profile: six steps

A complete aluminium extrusion system: six processes from billet intake to finished-goods dispatch in one park, with an anodising line and an automatic coating line; max circumscribed circle φ380 mm, min wall thickness 0.8 mm, complex hollow chambers formed in one pass.ระบบการผลิตครบวงจร 6 ขั้นตอน

Process setups shown here are typical examples; exact specs, precision and tolerances are confirmed at drawing review and per order.

PROCESS · Process Flow

Billet furnace control room
STEP 01 · BILLET FURNACE

PROCESS / 01

Billet Heating

Billets are charged by batch; the control room sets temperature and time per alloy and zone to prepare a uniform structure for extrusion. Every heat is logged with its batch and traceable to a project and order.

  • Zoned temperature control
  • Batch logging
  • Dual China–Thailand Standards
  • Uniform structure
  • Heats traceable to projects
Extrusion press mid-extrusion
STEP 02 · EXTRUSION PRESS

PROCESS / 02

Extrusion: several press capacity classes, scheduled to the section

Presses are assigned by circumscribed circle and wall thickness, with large sections and thin walls run on separate lines; multi-spec sections come straight from the die drawing, backed by die ovens and compressed air for continuous output

  • Largest circumscribed circle φ380 mm
  • Minimum wall thickness 0.8 mm
  • Complex hollow cavities in one pass
  • Sections straight from die drawings
  • Custom die support
Extruded profiles lined up (schematic)
STEP 03 · COOLING BED & PULLER

PROCESS / 03

Cooling table · pulling & straightening

Extruded profiles cool evenly on the cooling table while the puller guides and straightens them — keeping straightness and section dimensions stable, a precision base for assembly and further processing.

  • Even cooling
  • Pulling & Straightening
  • Straightness control
  • Stable section dimensions
  • Precision for downstream work
Finished profile storage
STEP 04 · AGING & STORAGE

PROCESS / 04

Ageing

Profiles enter the ageing process for mechanical-strength enhancement, then move to zoned finished-goods storage and per-project stocking once at engineering-use condition — five product lines warehoused in one park, significantly compressing lead times.

  • Ageing strengthens
  • Stocked by project
  • In-park production cuts coordination
  • Five product lines warehoused in one park
  • Scheduled back from site milestones
Surface treatment line
STEP 05 · ANODISING

PROCESS / 05

Blasting and anodising

Blasting is run as pre-treatment to clean the substrate and give an even key for the coating or oxide film. Anodising grows a dense oxide film covering appearance, corrosion resistance and insulation. Pre-treatment for coastal and hot-humid jobs is reinforced to salt-spray conditions

  • Even, dense oxide film
  • Corrosion and insulation resistance
  • Salt-spray ready
Auto-spray line
STEP 06 · AUTOMATIC SPRAY LINE

PROCESS / 06

Auto-Spraying

The auto-spray line applies fluorocarbon and powder coatings — fine, even, strongly bonded, weather- and corrosion-resistant. Built for Southeast Asia's tropics: light, strong, corrosion-proof.

  • Automated spraying
  • PVDF and powder coating
  • Weather & corrosion proof
  • Fit for tropical SE Asia
Equipment and capability table (click to expand)
Ranges for standard parts; exact specs, tolerances and lead times are set by drawing review and order confirmation
Press capacity classesSeveral press capacity classes, matched to each section's circumscribed circle and wall thickness
Largest circumscribed circleφ380 mm (rectangular and shaped sections reviewed per drawing)
Minimum wall thickness0.8 mm (confirmed by section and alloy)
Output basisVaries with section weight per metre and surface finish; the production window is set by drawing review and order confirmation
FinishTwo treatments: coating (PVDF / powder) and anodising
Shortest lead time12 days from drawing sign-off to shipment (standard custom parts); add 7 days for a new die and first-article trial
Standards appliedChinese national and Thai TIS standards run in parallel; clients pick one for acceptance by project location