BACKGROUND · Project Background

As a general contractor for infrastructure, China Railway Erjian's Thailand projects need architectural profiles in a particular way: standard sections, large volumes, hard deadlines. Door-and-window stock, railings and structural supports must arrive before each construction milestone — any late delivery eats directly into the site schedule.

ALA took on the partnership through its architectural profiles segment: stock sections go straight into production while special sections get dies made from drawings. Production is scheduled backwards from on-site milestones so material arrival meshes with the installation plan, and repeat orders slot straight in — turning 'reliable bulk supply' into a deliverable service.

SPEC · Supply Specifications

Products suppliedArchitectural profiles for door-and-window stock, railings and structural supports
Sections & wall thicknessExtruded to national-standard wall thickness: stock sections straight into production, special sections die-made from drawings
FinishSandblast pre-treatment, fluorocarbon / powder coating, reinforced for coastal salt air
Quality recordsThird-party-tested wall deviation ≤0.05 mm, traceable batch samples
Supply methodScheduled backwards from milestones, repeat orders slotted in

RESULT · Project Results

Every batch arrived on its milestone without a single schedule adjustment caused by profile supply; batch samples and test records were archived with the project, ready for compliance review. This milestone-back scheduling plus slot-in repeat orders later became ALA's standard model for infrastructure clients.