BACKGROUND · Project Background
As a general contractor for infrastructure, China Railway Erjian's Thailand projects need architectural profiles in a particular way: standard sections, large volumes, hard deadlines. Door-and-window stock, railings and structural supports must arrive before each construction milestone — any late delivery eats directly into the site schedule.
ALA took on the partnership through its architectural profiles segment: stock sections go straight into production while special sections get dies made from drawings. Production is scheduled backwards from on-site milestones so material arrival meshes with the installation plan, and repeat orders slot straight in — turning 'reliable bulk supply' into a deliverable service.
SPEC · Supply Specifications
| Products supplied | Architectural profiles for door-and-window stock, railings and structural supports |
| Sections & wall thickness | Extruded to national-standard wall thickness: stock sections straight into production, special sections die-made from drawings |
| Finish | Sandblast pre-treatment, fluorocarbon / powder coating, reinforced for coastal salt air |
| Quality records | Third-party-tested wall deviation ≤0.05 mm, traceable batch samples |
| Supply method | Scheduled backwards from milestones, repeat orders slotted in |
RESULT · Project Results
Every batch arrived on its milestone without a single schedule adjustment caused by profile supply; batch samples and test records were archived with the project, ready for compliance review. This milestone-back scheduling plus slot-in repeat orders later became ALA's standard model for infrastructure clients.